Display:
Phone
Tablet
Small Desktop
Large Desktop
FIND THE BEST LOCAL INSTALLER FOR YOUR NEXT PROJECT

Taylor Lane Timber Frame

1.0/5 Stars - 1 reviews

Rotherwas Industrial Estate, Hereford
0 Positive Reviews
1 Negative Reviews
Enquire

Please enter your details and
we’ll get in touch ASAP.


Tell us about a review for Taylor Lane Timber Frame

Your details        This will not be published or disclosed to any other party.

Write a review for Taylor Lane Timber Frame

Drop Files here to upload or click to select.
Include a copy of proof of purchase so that we can verify your review.
Your details will NOT be used for marketing purposes or sent to any third party.
For further infomation on how we store and use your data and your rights in relation to your data, please see our Privacy Policy
By submitting this form, you are agreeing that you have read and understand our Terms and Conditions.

Sort By Score - Sort By Date

About Taylor Lane Timber Frame

Sorry there are no posts yet.
April 2023
Taylor Lane – Wooden Frame supply First Survey TL contractors sent – the ground workers noticed that the survey was incorrect and the footings were not aligned with the existing barn Second Survey The same people sent from TL following my/groundworkers/architect concerns about the first survey who were filmed kicking the posts and strings to realign the first survey outlines Cancelled concrete pour due to 2nd incorrect survey causing 6 week delay and extra concrete costs due to larger than needed footings from incorrect surveys Independent company bought in for correction survey finds 238 mm orientation mistake (£600 cost) and further delays Construction mistakes: - North Wall:- All 3 arrow slit windows are double the correct size from the plans Door frame 100 mm to small in height (needing corrections) East Wall 2500 mm to big and needed to be reconstructed so that it fit with South wall (2 days work) West Wall Both downstairs windows are different sizes (heights) – they should have been the same – steel girder drilled in the wrong place (TL had to correct this) The Bathroom wall not constructed/supplied at all Unable to construct the frame in the time frame needed (due to incorrect survey) so had to get others to do this at a significant extra cost above and beyond the TL quote (The TL offer to construct was months to late on top of the survey delay) Lintels not costed or provided – only told they would not be supplied in January 2023 Internal wall Supports Two of the internal walls were out of alignment to footings measurements First Survey TL contractors sent – the ground workers noticed that the survey was incorrect and the footings were not aligned with the existing barn so footings were stopped Second Survey The same people sent from TL following my/groundworkers/architect concerns about the first survey who were filmed kicking the posts and strings to realign the first survey outlines Cancelled concrete pour (again) due to 2nd incorrect survey causing 6 week delay and extra concrete costs due to larger than needed footings from incorrect surveys £££ Independent company bought in for correction survey finds 238 mm orientation mistake (£600 cost) and further delays (TL said there tolerances were 5mm otherwise they would not construct) Construction mistakes: - North Wall:- All 3 arrow slit windows are double the correct size as shown on the plans. Door frame 100 mm to small in height (needing corrections) East Wall :- 2500 mm to big and needed to be reconstructed so that it fit with South wall (2 days work) West Wall:- Both downstairs windows are different sizes (heights) – they should have been the same – steel girder drilled in the wrong place (TL had to correct this) The Bathroom wall not constructed/supplied at all Taylor Lane said they were unable to construct the frame in the time frame needed (due to incorrect survey) so had to get others to do this at a significant extra cost above and beyond the TL quote (The TL offer to construct was months to late on top of the survey delay) Internal wall Supports were out of alignment to footings measurements Lintels not costed or provided – only told they would not be supplied in January 2023 Taylor caused the loss of scheduled contractors due to the delays caused - the project is now 6 months late and £25k over budget due to their incompetence and duplicities . I have an invoice but your proof of purchase box will not upload or allow me to copy/paste?

Report this posting

If you think this posting is a hoax, malicious, or unfair please report it for investigation

Click here to see more reviews for Taylor Lane Timber Frame

The above reviews are the opinions of the individuals submitting them and not necessarily a true reflection of the performance of this business. We therefore disclaim all liability and responsibility arising from any reliance placed on them.

')

We monitor the performance of over 15,000 home improvement businesses to make sure customers like you can buy with confidence.

We can help you find the best quote for your project, or you can submit your best quote to us and we'll use our buying power to get you a guaranteed trade discount.

But it doesn't stop there because we’ll also protect your deposit and monitor the work carried out by your chosen contractor.

All for FREE!

We're Trading Standards approved too, so buy through us and you really can buy with confidence!




Loading...