Display:
Phone
Tablet
Small Desktop
Large Desktop
257 Positive Reviews
2 Negative Reviews
Enquire

Please enter your details and
we’ll get in touch ASAP.


Tell us about a review for Realistic Home Improvements

Your details        This will not be published or disclosed to any other party.

Write a review for Realistic Home Improvements

You can post a review for this business here. Please note that all reviews are subject to moderation before publication and confirmation that you are a genuine customer.

Drop Files here to upload or click to select.
Include a copy of proof of purchase so that we can verify your review.
Your details will NOT be used for marketing purposes or sent to any third party.
For further infomation on how we store and use your data and your rights in relation to your data, please see our Privacy Policy
By submitting this form, you are agreeing that you have read and understand our Terms and Conditions.

Reviews (259)
News, Offers & Showcase

About Realistic Home Improvements

Showcase 7 years ago
Ultraframe Loggia with LivinROOF
Ultraframe Loggia with LivinROOF
Showcase 7 years ago
Conservatory with LivinROOF
Conservatory with Ultraframe LivinROOF
 
Showcase 7 years ago
Lean-To conservatory with LivinROOF
Lean-To conservatory with LivinROOF
 
Showcase 7 years ago
Window Replacement
White uPVC windows with Georgian astragal bars.
 
Showcase 7 years ago
uPVC Porch
Installation of white uPVC porch using existing metal frames.
 
Showcase 7 years ago
Loggia
Ultraframe Loggia
 
Showcase 7 years ago
LivinROOF
Removal of old conservatory roof and replaced with Ultraframe LivinROOF
 
May 2018
My conservatory build was so problematic that I had to cut ties with the company and pay 2 others £1,488 and £65 respectively to carry out remedial work . Problems included not building what I had signed up to, wrong colour glass installed, floor covering not level, door hinges had to be replaced, poor finishing on plastering, roof panel installed upside down, weeks exposed to the elements as there was no front on the room, different colour cream trims inside and out, sound of gushing water whenever it rained, water coming in in several places etc. Took weeks to resolve some problems, failed to resolve some satisfactorily, gave many broken promises about dates when work would be carried out, considered serious problems as "snags". A very stressful experience.

Company Response

We take full responsibility for our builds and welcome feedback, which enables us to move forward in a proactive way. The design was agreed prior to any works commencing, the problems relating to the glass, hinges, plastering and floor level were all completed as part of the ongoing build process. A roof pane of glass was labelled upside down and subsequently installed incorrectly, when it rained it became apparent that the glass was not dispensing water the same as the other panes, we therefore reversed the pane which corrected the error. Mrs Tamblyn’s photograph of the plastering shows that the plastering does not go to an acceptable floor finish for the exclusion of skirting board. This was our mistake, we assumed Mrs Tamblyn would at some point have skirting board installed into the room. The plasterer was sent back to rectify his work, which can be seen clearly in Mrs Tamblyn’s 1st photograph taken whilst the plastering was drying out. - Our plasterer now asks the question on future skirting board requirement. Products are ordered from survey after the ground base works are complete, this ensures that the products fit correctly, it limits risk or problems, but it does delay installation time, which is exasperated when ordering coloured products, especially coloured aluminium frames, both of which were part of Mrs Tamblyn’s contract. PVCu coloured profile and aluminium profile are impossible to match exactly as they are both different materials. We were not able to meet Mrs Tamblyn’s expectations for her installation, we therefore felt it fair to offer her the option of: 1, Allow us to put down the latex self-levelling compound, which would take out the defects she had pointed out in the floor. This would then leave the outstanding balance to be settled and her guarantees sent in the post. 2, Not pay her sizeable outstanding balance and waiver her 10-year guarantee. Finally, we do not consider the building process to be a problem, we do have snags, which we overcome. We try to work together with our clients and hope that the majority will have a good experience when dealing with us, sadly though, we are not always successful.

Report this posting

If you think this posting is a hoax, malicious, or unfair please report it for investigation

Click here to see more reviews for Realistic Home Improvements

The above reviews are the opinions of the individuals submitting them and not necessarily a true reflection of the performance of this business. We therefore disclaim all liability and responsibility arising from any reliance placed on them.

')

We monitor the performance of over 15,000 home improvement businesses to make sure customers like you can buy with confidence.

We can help you find the best quote for your project, or you can submit your best quote to us and we'll use our buying power to get you a guaranteed trade discount.

But it doesn't stop there because we’ll also protect your deposit and monitor the work carried out by your chosen contractor.

All for FREE!

We're Trading Standards approved too, so buy through us and you really can buy with confidence!




Loading...